|
|
TM 5-4120-386-14
4-25. JUNCTION BOX-Continued.
LOCATION/ITEM
ACTION
REMARKS
Repair/
Replacement-
Continued
Remove four screws (4), four flat
12. Phase Sequence
a.
Relay (KS)
washers (5), and four nuts (6).
Remove phase sequence relay
b.
(KS) (25) from the junction box.
Install replacement relay (K5)
c.
and secure with four screws (4),
four flat washers (5), and four nuts
(6).
Remove the circuit breaker
.3. Control
a.
Circuit
mounting nut and lockwasher
Breaker
(33) from front of the
(CB2)
junction box and pull the cir-
cuit breaker (CB2)(34) to the rear
of the junction box.
b.
Install replacement control
circuit breaker (CB2)(34) through
opening in junction box.
Install the circuit breaker
c.
mounting nut and lockwasher (33)
to secure circuit breaker.
14. Terminal
Remove two screws (31), two flat
a.
Board (TB1)
washers (19) and two nuts (24).
and
b. Remove terminal board (TB1) (32)
Marker
and marker strip (35) from
Strip
junction box.
c. Install replacement terminal
board (TB1) (32) and marker
strip (35) on junction box.
d. Secure to junction box using two
screws (31 ), two flat washers
(19) and two nuts (24).
Installation
Carefully install junction
15. Junction
a.
box in housing and secure
Box
with seven screws (1) and
seven lockwashers (2).
See para. 4-24.
b. Install the control module.
See para. 4-18.
c. Install evaporator inlet
louver
See para. 4-17.
d. Install top front cover.
4-60
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |