TM 5-4120-386-14
This task covers:
a.
Inspection
Repair
d.
Removal
Installation
b.
e.
Test
c.
INITIAL SETUP
Equipment
Condit ion
Condition Description
Para
Top Covers removed.
Evaporator Inlet Louver removed.
Control Module removed.
Junction Box partially removed.
Test Equipment
Special Tools
Tool Kit SC5180-90-CL-N18
Continuity Tester
Materials/Parts
Solder (Item 2, App, D)
Flux (Item 15, App. D)
REMARKS
LOCATION/ITEM
ACTION
Disconnect air conditioner power
supply before doing maintenance
work on the electrical system.
Inspect all installed wiring
a.
Inspection
for cracked or frayed insulation.
Pay particular attention to wires
passing through holes in the
frame or routed around sharp
edges.
b . Inspect electrical connectors
and fittings for damage.
4-61
|