|
|
TM 5-4120-386-14
This task covers:
Repair/Replacement
Removal
d.
Installation
e.
nspection
c. Test
INITIAL SETUP
Equipment
Condition
Condition Des cription
Para
Top Front Cover removed.
Evaporator Inlet Louver
removed.
Control Module removed.
Test Equipment
Tester
Variable Voltage Power Source (AC/DC)
Materials/Parts
Sp ecial Tools
Tool Kit SC5180-90-CL-N18
Solder (Item 2, App. D)
Flux (Item 15, App. D)
REMARKS
ACTION
LOCATION/ITEM
Removal
1. Junction Box
Disconnect air conditioner power
supply before doing maintenance
work on the electrical system.
Remove seven screws (1) and
a.
seven lockwashers (2) that
secure the junction box to
the housing.
Support the
Partially remove the junction
b.
junction box
box by pulling it forward and
to relieve
out of the air conditioner.
the strain on
wiring.
4-55
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |