Click here to make tpub.com your Home Page

Page Title: SECTION II MAINTENANCE PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-386-14
SECTION II MAINTENANCE PROCEDURES
6-2. HOUSING - REPAIR/REPLACE.
This task covers:
a.  Removal
b. Inspection
c.  R e p a i r / R e p l a c e
INITIAL SETUP
Materials/Parts
Special Tools
Adhesive (App.D, Item 18)
TO OI Kit SC 5180-90-CL-N18
Cellular Rubber Strips (App.D, Item 19)
Flexible Polyurethane Foam (App.D, Item 20)
Cloth, Lint free (App.D, Item 9)
Acetone (App.D, Item 22)
Methyl-Ethyl-Ketone (MEK) (App.D, Item 23)
Paint, Forest Green (MIL-C-461 68)
Paint Brush
Sandpaper, 240 Grit
Primer (TT-P-1757)
LOCATION/ITEM
ACTION
REMARKS
Inspection
Inspect for damage. Look
a.
for loose, frayed, cracked
and missing insulation.
b. Visually check for excessive
drying of insulation, or
shrinkage.
Removal
a.
Scrape and pull off as much
of the damaged insulation
as possible.
Acetone and methyl-ethyl ketone
are flammable and their vapors
are explosive. Prolonged or
repeated inhalation of fumes
or contact with the skin can
be toxic. Use in a well
ventilated area, wear gloves
and keep away from sparks or
flame.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business