Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SOLENOID VALVES (L1 AND L2) TEST AND COIL REPLACEMENT CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-387-14 (1) Use a multimeter set on lowest OHMS scale to check for continuity between cortacts I and M on  L1 (connector P4) and contacts H and g on L2 (connec- tor P4). If continuity is not found,   coil is open and must be replaced. (2) Use multimeter to check for continuity between each contact in connec- tor P4 and coil casing. If continuity is found between either contact (I and M, L1 or H and g, L2), the coil is grounded and should be replaced. (3) If continuity checks are satisfactory, apply 28 volts dc from an external power source across contacts I and M on L1 (connector P4). Listen for a sharp click when valve changes position. If click is not heard, internal valve problems are indicated and entire valve should be replaced. (Go to para 5-19.) (4) Repeat the above test on valve L2. Apply 28 volts dc to contacts H and g (P4). Replace entire valve if click is not heard. (Go to para 5-19.) 5-39