Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LIQUID QUENCH EXPANSION VALVE (V4)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-387-14 (7) Purge the system with nitrogen and debraze the tube connections. (See para 5-7 and 5-8.) (8)  Remove  the  valve  body. b. Installation. If valve body was not removed, go to step (3). (1) Place the valve body on the tube ends, purge the system with nitrogen and braze the tube joints. (See para 5-7 and 5-8.) (2) Using a screwdriver, secure the valve body to unit with two screws and lockwashers. (3) Check internal surfaces of valve body to he sure it is clean. (4) Carefully install diaphragm, O-ring, and tube and plunger. Secure to valve body with two screws. (5)  place  coil  assembly  and  data  plate  onto  tube  and  plunger  and  secure with nut. For Model 3873, also install spacer onto coil assembly. (6) Replace the dehydrator. (See  para  5-13) (7) Leak test all newly connected joints and those in the repaired area. (See para 5-9.) (8) Evacuate and charge the refrigerant system. (See para 5-10 and 5-11.) Follow-on procedures: 1. Install junction box. (See para 4-29.) 2. Install  top  panel. (See  para  4-23.) 5-20. LIQUID QUENCH EXPANSION VALVE (V4) Preliminary procedure: 1. Remove top panel. (See para 4-23.) 2. Remove  fan  motor. (See para 4-60.) Change  3 5-43

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business