TM5-4120-387-14
4-9. INSTALLATION INSTRUCTIONS
All alterations to the shelter or facility into which the air conditioner is to be
installed should be complete before installation of air conditioner.
Personnel required: 2
DO NOT
Otherwi
LIFT without holding unit in upright position.
se, unit will fall over and could cause injury to
personnel.
a.
Move air conditioner into position and aline mounting holes.
b.
Secure unit with appropriate mounting hardware.
Base - .4375-14 UNC (4 holes)
c.
Seal all openings around cutouts for air conditioner, air and water tight.
Use gasket, caulking, or other suitable material.
d.
The air conditioner is provided with
2-4.) Remove plugs from all drains possibly
sate water.
If water from these drains will
external overboard drains can be connected
fittings to connect base drains. Any type
drain line.
The drain line should lead to
four drain holes in base.
(See figure
e for most complete drainage of conden
be objectionable or create a hazard,
Use standard 1/2-14 NPT male pipe
of hose or tubing may be used as a
an appropriate facility drain, storm
sewer, dry sump, or an acceptable outside area. Be-sure the entire length of the
drain line is at the same height, or lower than the base to ensure gravity drain-
age.
e.
Install a 10 AWG minimum ground wire between frame ground (FR-GND) on air
conditioner cabinet and an adequate earth ground.
4-13
|