4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: Section II SERVICE UPON RECEIPT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
Section II SERVICE UPON RECEIPT
4-2. Unloading. The air conditioner is shipped in a container designed for handling the unit in an upright position. The
base of the container is constructed as a shipping pallet.
a. Remove Tie Downs. Remove all blocking and tie downs that may have been used to secure the container to the
carrier.
WARNING
Do not allow anyone under equipment suspended from a lifting device. Do not
allow the unit to swing while suspended from a lifting device. Failure to observe
this warning may result in injury to personnel and damage to the equipment.
CAUTION
Use care in handling to avoid damage to the air conditioner. If an overhead lifting
device must be used, use an appropriate sling so that the weight of the unit is
supported by the base of the shipping container.
b. Material Handling. Use a forklift truck or other suitable material handling equipment to remove the unit from the
carrier.
4-3. Unpacking. Normally, the packaged air conditioner should be moved into the immediate area in which it is to be
installed before it is unpacked.
NOTE
The shipping container is of such a design that it may be retained for reuse If
frequent relocation of the air conditioner is anticipated.
a. Remove shipping container. Cut the metal bands that hold the top and sides of the container to the base. Lift
the container vertically and remove it from the base and cabinet.
b. Remove packaging. Remove the cushioning around the top of the cabinet and retain If reuse is anticipated.
Remove the preservation barrier by tearing around the bottom of the cabinet.  Remove the technical publications
envelope and accessory sack that are taped to the cabinet.
WARNING
Do not allow anyone under equipment suspended from a lifting device. Do not
allow the unit to swing while suspended from a lifting device. Failure to observe
this warning may result in injury to personnel and damage to the equipment.
c. Remove pallet. Attach an overhead hoist with appropriate sling and spreader bar to the lifting rings provided at
each side of the cabinet. Raise the cabinet and remove the four carriage bolt assemblies that hold the tiedown bars to the
pallet from the underside of the pallet. Remove the four bolts that hold the two tiedown bars to the unit base. Remove
and retain the pallet and carriage bolt assemblies and the tiedown bars and bolts if reuse is anticipated. Be sure to
remove all remaining barrier material from the underside of the cabinet base. Lower the cabinet to the floor in the desired
position and remove the sling and hoist.
4-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business