TM 5-4120-393-14
TYPICAL CRATED AIR CONDITIONER
NOTE
It is recommended that the cabinet be left bolted to the shipping pallet until time to
place the unit in its installed position. All receiving inspection actions can be
conducted without removal from the pallet.
4-4. Receiving Inspection. Perform receiving inspection of the air conditioner as follows.
a. Inspect. Inspect the unit for damage incurred during shipment. If the equipment has been damaged, report the
damage on DD Form 6, Packaging Improvement Report.
b. Check. Check the unit against the packing slip to see if shipment is complete.
Report all discrepancies in
accordance with the instructions of DA PAM 738-750.
c. Modified. Check to see whether the equipment has been modified.
4-3
|