4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: Receiving Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
TYPICAL CRATED AIR CONDITIONER
NOTE
It is recommended that the cabinet be left bolted to the shipping pallet until time to
place the unit in its installed position.  All receiving inspection actions can be
conducted without removal from the pallet.
4-4. Receiving Inspection. Perform receiving inspection of the air conditioner as follows.
a. Inspect. Inspect the unit for damage incurred during shipment. If the equipment has been damaged, report the
damage on DD Form 6, Packaging Improvement Report.
b. Check.  Check the unit against the packing slip to see if shipment is complete.
Report all discrepancies in
accordance with the instructions of DA PAM 738-750.
c. Modified. Check to see whether the equipment has been modified.
4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business