4120-01-238-4277">

 

Click here to make tpub.com your Home Page

Page Title: Junction Box Number One Harnesses and Leads
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-393-14
4-41. Junction Box Number One Harnesses and Leads
This task covers:
a. Removal
c. Testing
e. Installation
b. Inspection
d. Repair
Initial setup.
Tools:
Tool kit, service, refrigeration unit NSN 5180-00-596-1474
Multimeter NSN 6625-00-553-0142
Personnel: 1
Equipment condition:
1. Turn unit power off at power source. If there is a chance that it will be turned on, also disconnect power
cable to air conditioner.
2. Remove lower front panel. See para 4-24.
General Safety Instructions:
WARNING
Disconnect input power to the air conditioner before performing any internal
maintenance. Voltages used can KILL. Shutting the unit off at the control panel
does not disconnect unit power.
REMOVAL
1.
Using a screwdriver, remove four screws (1) from junction box cover (2). Remove junction box cover.
NOTE
Inspection/Testing (installed) can be done at this point.
2.
Using screwdriver and wrench, remove four screws (3), washers (4), and nuts (5) to remove connector from junction
box.
4-98

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business