4120-01-238-4277">
|
|
TM 5-4120-393-14
4-45. Terminal Boards (TB1 and TB2)
This task covers:
a. Removal
c. Installation
b. Inspection
Initial setup.
Tools:
Tool kit, service, refrigeration unit NSN 5180-00-596-1474
Personnel: 1
Equipment condition:
1. Turn unit power off at power source. If there is a chance that it will be turned on, also disconnect power
cable to air conditioner.
2. Remove lower front panel. See para 4-24.
General Safety Instructions:
WARNING
Disconnect input power to the air conditioner before performing any internal
maintenance. Voltages used can KILL. Shutting the unit off at the control panel
does not disconnect unit power.
REMOVAL
1.
Using screwdriver, remove four screws (1) from junction box cover (2). Remove cover (2).
NOTE
Inspection/Testing (installed) can be done at this point.
2.
Tag and disconnect wire leads.
3.
Using screwdriver, remove four screws (3) from each terminal board and remove terminal board (4).
4-107
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |