TM 55-8145-221-14&P
Change 1
0017 00-4
DISCONNECT LOAD
BEFORE
SWITCHING
120V
1PH
FU1
CB1
120/
208V
3PH
CAUTION
120/208V
120/240V
120V
L1,L2,L3,L0
L1,L2,L3
120/
240V
1PH
L3,L0
REFRIGERATED CONTAINER SYSTEM
SERVICE UPON RECEIPT Continued
0017 00
GENERATOR SET PREPARATION Continued.
6. Set the A/C Voltage reconnection switch.
a.
Remove fasteners (1, Figure 2) on control panel (2) and pull forward.
b. Set A/C voltage switch (3) to the 120/208 VAC, three phase position.
c.
Verify DC Control circuit breaker (4) is energized.
d. Replace control panel (2) and reinstall fasteners (1).
FUEL
START
QUARTZ
AMPERS
D.C.
0
CHARGE
DISCHARGE
55
HERTZ
60
65
70
0
25
50
100
125
133
100
180
260
300
PHASE
Figure 2. Generator Set Preparation
VIEW ROTATED
90 CCW
LOCATED BEHIND
CONTROL PANEL
PRESS
TO RESET
FUEL LEVEL
BATTERY CHARGE
E
F
1/2
COOLANT TEMP
OIL PRESSURE
MASTER SWITCH
PRIME & RUN
AUX FUEL
OFF
PREHEAT
ENGINE
TOTAL HOURS
EMERGENCY
STOP
PUSH
TO STOP
OFF
OPEN
BATTLE SHORT
VOLTAGE
POWER
ON
OFF
ON
CLOSED
AC
VOLTS
HOBBS
PRIME
& RUN
AC CIRCUIT
INTERRUPTER
PANEL
LIGHTS
100
140
180
240
0
80
40
PRESSURE
-10
+10
+20
75
60 HERTZ
140
220
AM-VM
VOLTS
2
1
3
3
1
L3-L1 L3-L0
PERCENT RATED
CURRENT
4
3
|