4-5. SERVICE UPON RECEIPT OF EQUIPMENT.
a. Unloading the Equipment.
(1) The crated panels and components of the prefabricated refrigerators may be shipped either by tractor-trailer
or rail. The operator and organizational maintenance personnel will remove all tie-down cables, strapping,
blocking, and the like, which secure the crated or skid-mounted components to the bed of the carrier.
Remove all tie-downs and blocking (fig. 4-4).
(2) Use a suitable lifting device of sufficient capacity, and remove the crated or skid-mounted components from
the bed of the carrier.
(3) Remove banding, crating, and blocking, being extremely careful not to damage the panels. If skidmounted,
cut the strapping and remove cushioning and spacers. Unpack separately packed component from the
container. Remove tape from drains, switches, and power receptacles.
Figure 4-4. Blocking and Tie-Downs
b. Checking Unpacked Equipment.
(1) Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage on DA Form 368 Quality Deficiency Report (QDR).
(2) Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with the instructions of DA PAM 738-750.
(3) Check to see whether the equipment has been modified.