TM 9-4110-257-14
4-34.
CONTINUOUS DUTY SOLENOID K5 TESTING AND REPLACEMENT.
This task covers:
a.
Testing
b.
Removal
c.
Installation
INITIAL SETUP:
Materials/Parts:
Equipment Conditions:
Lock Washers (2)
Refrigeration unit shut down (para 2-7) and battery
1, Appendix G
disconnected (para 4-35).
Lock Washers (2)
Control panel cover door raised and latched.
1, Appendix G
Marker tags (4)
7, Appendix E
a.
Testing. (See Figure 1-4.)
(1)
Be sure battery has been disconnected and remove two bolts (1) and lock washers (2). Open
control panel (3). Discard lock washers.
Figure 4-28. Continuous Duty
NOTE
Terminal hardware is supplied with continuous duty solenoid.
(2)
Tag wire leads (4) and remove nuts (5), lock washers (6) and wire lead.
4-86
|