| |
TM 9-4110-257-14
c.
Installation.
(1)
Install push switch (3), two bolts (6), flat washers (5), and new self locking nuts (4).
NOTE
Smaller diameter sleeving insulation must go over wire lead connecting to
push switch terminal C.
(2)
Install insulation sleeving (1) over wire leads (2).
(3)
Using tags and wiring diagram (fig. 1-4), connect wire leads (2). Remove tags.
NOTE
Sleeving insulation covers only terminal C on one side of push switch, but
must cover both terminals NO and NC on the other side.
(4)
Slip sleeving insulation (1) over exposed terminals and shrink in place using heat gun.
NOTE
FOLLOW-ON MAINTENANCE:
Close both side condenser doors.
Connect battery (para 4-35) and put unit back into service.
4-95
|