Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 4-42. ENGINE PULLEY REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4110-257-14 4-42. ENGINE PULLEY REPLACEMENT. This task covers: a. Testing b. Removal c. Installation INITIAL SETUP: Equipment Conditions: General Safety Instructions: Refrigeration unit shut down (para 2-7) and battery WARNING disconnected (para 4-35). V-belts removed from engine pulley only (para 4-38). Exposed  rotating parts are used in the refrigeration unit.  Personal injury can result if battery is connected. a. Removal. (1) Remove three bolts (1), and install two bolts back into threaded holes in bushing (2).  Tighten bolts evenly to separate bushing from pulley (3).  Remove two bolts from bushing. Figure  4-36.   Engine Pulley (2) Slide bushing (2) and pulley (3) off engine drive shaft (4) being careful not to lose keys (5) and (6). 4-106

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business