| |
TM 9-4110-257-14
5-29. SOLENOID VALVE L2 ( DEFROST LINE ) REPLACEMENT.
This task covers:
a.
Testing
b.
Removal
c.
Installation
INITIAL SETUP:
Materials /Parts:
Equipment Conditions:
Marker tags (2)
Refrigeration system discharged (para 5-7).
7, Appendix E
Left side condenser door open.
a.
Removal.
(1)
Tag and disconnect wire leads (1).
NOTE
Solenoid coil mounting hardware is supplied with solenoid valve.
(2)
Remove screw (2), lock washer (3), data plate (4), and solenoid coil (5).
Figure 5-25. Solenoid Valve
5-56
|