5-32. TUBING AND FITTINGS TESTING, REPAIR, AND REPLACEMENT. - Continued
c.
Installation.
(1)
Purge (para 5-8) and braze (para 5-9) any loose tubing or fitting connections.
(2)
Flare tubing end where damaged flare was removed or on end of new tube if it was too short to flare.
(3)
Replace dehydrator (para 5-14).
(4)
Leak check (para 5-10), evacuate (para 5-11), and charge (para 5-12) the refrigeration system.
(5)
Apply silicone RTV into evaporator frame grommets to seal evaporator enclosure.
(6)
Secure capillary lines to pipe illustrated using tie down strap(s) as necessary.
NOTE
FOLLOW-ON MAINTENANCE:
Close/install any doors, panels, guards removed.