Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Installation.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4110-257-14 5-32. TUBING AND FITTINGS TESTING, REPAIR, AND REPLACEMENT. - Continued c. Installation. (1) Purge (para 5-8) and braze (para 5-9) any loose tubing or fitting connections. (2) Flare tubing end where damaged flare was removed or on end of new tube if it was too short to flare. (3) Replace dehydrator (para 5-14). (4) Leak check (para 5-10), evacuate (para 5-11), and charge (para 5-12) the refrigeration system. (5) Apply silicone RTV into evaporator frame grommets to seal evaporator enclosure. (6) Secure capillary lines to pipe illustrated using tie down strap(s) as necessary. NOTE FOLLOW-ON MAINTENANCE: Close/install any doors, panels, guards removed. 5-64

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business