Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 5-33. HEAT EXCHANGER REPLACEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4110-257-14 5-33.  HEAT EXCHANGER REPLACEMENT. This task covers: a. Testing b. Removal c. Installation INITIAL SETUP: Materials/Parts: Equipment Conditions: Lock Washers (2) Refrigeration system discharged (para 5-7) and purged 1, Appendix G (para 5-8). Insulation Tape Evaporator coil guard removed (para 4-18). 10, Appendix E a. Removal. (1) Remove insulation (1) as necessary. (2) Purge (para 5-8) and de-braze (para 5-9) four fittings (2) from heat exchanger (3). NOTE Note flow direction prior to removal. (3) Remove two bolts (4), lock washers (5), heat exchanger (3), and clamps (6). Discard lock washers. Figure  5-29.  Heat Exchanger 5-65

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business