| |
ARMY TM 9-4120-381-14
NAVY EE-000-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
INSPECTION
1.
If control rod is replaced, cut replacement control rod (7) to 13 inches (33 cm).
2.
Install control lever (2) with bolt (3) and locknut (4).
3.
Install control lever connector swivel (5) with locknut (1).
4.
Install actuator connector swivel (9) with locknut (10).
5.
Install control rod (7).
6.
Tighten screw (6) on control lever connector swivel (5).
7.
Tighten screw (8) on actuator connector swivel (9)
8.
Adjust linkage.
FOLLOW ON PROCEDURES
1.
Install left front condenser panel (para 4-27).
2.
Connect conditioner input power at source.
Figure 4-89. Condenser Fan Connecting Link Assembly
4-175
|