| |
ARMY TM 9-4210-381-14
NAVY EE-000-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
5-42.
RECEIVER - Continued.
FOLLOW ON PHOCEDURE
1.
Install circulator fan (para 4-71).
2.
Charge refrigerant system (para 5-17).
3.
Close control box (para 4-45).
Figure 5-31. Receiver
5-94
|