Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 5-43. DISTRIBUTOR.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4210-381-14 NAVY EE-000-CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 5-43. DISTRIBUTOR. This task covers: Inspection INITIAL SETUP: Tools Tool kit, service, refrigeration unit (Item 1, Appendix B) Personnel: 1 Material: Brazing alloy, silver, QQ-B-654, Grade III (Item 21, Appendix E) Equipment Conditions: WARNING Disconnect input power to the air conditioner before performing any internal maintenance.  Voltages used can KILL.  Shutting the unit off at the control panel does not disconnect unit power. 1. Disconnect air conditioner input power at source. 2. Swing open control box assembly (para 4-45). INSPECTION 1. Check for signs of leakage (see Figure 5-32).  Leak test if leak is suspected (para 5-15). 2. If a leak is detected at distributor joint, braze joint (para 5-14). 3. If a capillary line leak is detected, contact General Support Maintenance. FOLLOW ON PROCEDURE 1. Close control box (para 4-45). 2. Connect air conditioner input power at source. Figure 5-32.  Distributor 5-95

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business