| |
ARMY TM 9-4120-381-14
NAVY EE-00-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
5-52. CURRENT OVERLOADS (K23 AND K24) - Continued.
FOLLOW ON PROCEDURE
1.
Install electrical box cover (para 5-50).
2.
Install compressor into air conditioner (para 5-46).
3.
Connect air conditioner input power at source.
Figure 5-42. Current Overloads (K23 And K24)
5-124
|