| |
ARMY TM 9-4210-381-14
NAVY EE-000-CA-MMA-010/7053-AC
AIR FORCE TO 35E9-136-31
6-8 FRESH AIR INLET BOX
This task covers:
Inspection
Removal
Repair/Replace
Installation
INITIAL SETUP:
Tools:
Tool kit, service, refrigeration unit (Item 1, Appendix B)
Electric portable drill (Item 6, Appendix B)
Twist drill set (Item 7, Appendix B)
Riveter (Rivnut) (Item 9, Appendix B)
Personnel: 1
Equipment Conditions:
Open rear evaporator panel (para 6-6).
INSPECTION
1.
Check that box is not bent, cracked, or punctured. Replace box, if defective (see Figure 6-3).
2.
Check for damaged, loose, or missing mounting hardware.
NOTE
For removal of the thermostat box the air conditioner must be removed from the van or shelter.
REMOVAL
1.
Remove control wire J-box (para 4-33).
2.
Remove fresh air connecting link (para 4-34).
3.
Remove thermostat bracket (para 4-35).
4.
Remove six screws (8), flat washers (6), and lockwashers (7).
5.
Remove filter (4), and filter box (3).
REPAIR/REPLACE
Repair consists of replacing rivnuts (5) or box (3).
INSTALLATION
1.
Place box (3) in mounting position.
2.
Install six screws (8), lockwashers (7), and flat washers (6).
3.
Install fresh air connecting link (para 4-34).
4.
Install control wire J-box (para 4-33).
5.
Install thermostat bracket (para 4-35).
FOLLOW ON PROCEDURE
Close rear evaporator panel (para 6-6).
6-7
|