Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 6-18. DISTRIBUTOR.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4210-381-14 NAVY EE-000-CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 6-18.  DISTRIBUTOR. This task covers: Removal Inspection Repair/Replace Installation INITIAL SETUP: Tools: Tool kit, service, refrigeration unit (Item 1, Appendix B) Material: Brazing alloy, silver, QQ-B-654, Grade III (Item 21, Appendix E) Personnel: 1 Equipment Conditions: 1. System has been pumped down (para 5-21). 2. Remove rear evaporator panel (para 6-6). 3. Disassemble thermostatic expansion valve (para 6-17). REMOVAL 1. Debraze distributor (3) at valve joint (2) (para 5-14). NOTE Check the length of the new distributor lines before cutting lines distributor lines to coil. 2. Cut distributor lines (1) to coil (see Figure 6-13). 3. Remove distributor (3). INSTALLATION 1. Braze distributor lines (1) to coil lines (para 5-14). 2. Braze distributor (3) to valve joint (2) (para 5-14). 3. Leak test all newly connected joints and those in the repair area (para 5-15). FOLLOW ON PROCEDURE 1. Reassemble thermostatic expansion valve (para 6-17). 2. Perform start up after repairs (para 5-22). 3. Install rear evaporator panel (para 6-6). 6-28

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business