Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-000-CA-MMA-010/7053-AC AIR FORCE TO 35E9-136-31 6-22.  EVAPORATOR COIL REMOVAL - Continued. REMOVAL - Continued. 8. Remove four screws (30), locknuts (34), and twelve flat washers (31) and (33) securing evaporator coil to frame (32). 9. Remove  two  screws  (44),  four  locknuts  (41),  six  flat  washers  (42),  and  two  damps  (43)  from  evaporator  coil frame. 10. Remove receptacles if necessary. WARNING When handling coil, wear gloves to avoid injury to personnel and to reduce fin damage on the coil. 11. Protect fins of coil with metal plate. WARNING To  avoid  Injury  to  personnel  or  damage  to  equipment,  entire  system  must  be  purged  with  nitrogen before beginning any debrazing operation. 12. Debraze tubing and couplings six places (2), (13), (14), (15), (16), and (17) (para 5-14). 13. Debraze evaporator header (2). 14. Remove six screws (9), locknuts (7), and flat washers (8) mounting T-support to frame. 15. Remove receiver damp (10). 16. Remove sensing bulb line clamp (11). 17. Move plumbing assembly (12) to the right side of evaporator compartments. 18. Raise evaporator coil (25) and swing out and away from heating element compartment. 19. Remove evaporator coil (25). 20. Debraze distributor from primary expansion valve and coil (para 6-18). 21. Remove two bolts (38), locknuts (35), and four flat washers (36) and (37). 22. Remove expansion bracket (39). INSTALLATION WARNING When handling coil, wear gloves to avoid injury to personnel and to reduce fin damage on the coil. 1. Braze distributor to expansion valve and coil (para 6-18). 2. Place expansion valve and bracket (39) in mounting position on coil (25). 3. Install two bolts (38), locknuts (35), and flat washers (36) and (37). 4. Protect fins of coil with metal plate. 6-38

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business