Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FOLLOW ON PROCEDURE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

ARMY TM 9-4120-381-14 NAVY EE-000-CA-MMA-010 7053-AC AIR FORCE TO 35E9-136-31 6-22.  EVAPORATOR COIL REMOVAL - Continued. 5.    Position evaporator coil (25) into frame. 6.    Cut two inch lengths of 1-1/8 OD tubing. 7.    Place coupling on evaporator header joint (2). 8.    Install evaporator coil (25) to frame with four screws (30), eight flat washers (31) and (33), and four locknuts (34). 9.    Install two screws (44), six flat washers (42), two damps (43), and four locknuts (41). 10.    Install four rivnuts (26) for mounting heater assembly to frame. 11.    Place plumbing assembly (12) in position. 12.    Install receiver clamp (10). 13.    Install mounting T-support with six screws (9), flatwashers (8), and locknuts (7). 14.    If receptacles were removed, install quarter turn receptacles with four rivets. 15.    Install heater assembly (27) to frame with four screws (29), lockwashers (28), and flat washers (40). 16.    Position evaporator motor and fan mounting bracket in mounting position. 17.    Install four bolts (6), eight flat washers (3) and (5), and four locknuts (4). 18.    Braze tubing and coupling (2), (13), (14), (15), (16), and (17) (para 5-14). 19.    Install evaporator circulator fan (para 4-71). 20.    Install evaporator motor (para 4-70). 21.    Install control box to coil and fame (para 4-63). 22.    Install control box wiring harness bracket (19) with four screws (24), lock washers (22), and flat washers (21). 23.    Install wiring harness damp (1). FOLLOW ON PROCEDURE 1.    Install cage assembly, power head, and sensing bulb to primary expansion valve (para 5-38). 2.    Install solenoid coil (L1) to solenoid valve (para 4-88). 3.    Install power head, solenoid (L2) coil, and nut securing solenoid to bracket (para 5-35). 4.    Install high voltage plastic heater protector (para 4-80). 5.    Leak test all newly connected joints and those in the repair area (para 5-15). 6.    Evacuate and charge the refrigeration system (para 5-16 and 5-17). 7.    Install rear evaporator panel (para 6-6). 8.    Install right front evaporator panel (para 4-25). 9.    Install left front evaporator panel (para 4-23). 6-39 ;

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business