TM 9-4120-389-14
a. Inspection
(1) Check junction box for dents, cracks, or punctures. Replace if damage creates a hazard or
interferes with operation.
(2) Check for loose or missing edging (grommets).
(3) Check for loose or missing rivets.
(4) Check for bent, loose or missing clamps. Tighten or replace as needed.
b. Repair
(1) Repairs are limited to replacement of damaged or missing parts and tightening of clamps.
Follow-on procedures: Install junction box. (See para. 4-46).
1. Install junction box wiring harness (See para. 4-52).
2. Install transformer (T1) (See para. 4-51).
3. Install time delay relay (K1) (See para. 4-50).
4. Install relays (K3, K6, K2 and K5) (See para. 4-50).
5. Install terminal boards (TB1 and TB3) (See para. 4-48).
6. Install electrical connector (Jl) with leads (See para. 4-47).
7. Install junction box (See para. 4-46).
4-161
|