| |
TM 9-4120-389-14
4-53. JUNCTION BOX HOUSING
Preliminary procedures.
1. Remove junction box (See para. 4-46).
2. Remove electrical connector (J31) with leads (See para. 4-47).
3. Remove terminal boards (TB1 and TB3) (See para. 4-48).
4. Remove relays (K3, K6, K2 and K5) (See para. 4-50).
5. Remove time delay relay (K1) (See para. 4-50).
6. Remove transformer (T1) (See para. 4-51).
7. Remove junction box wiring harness (See para. 4-52).
Figure 4-55. Junction Box Housing
4-160
|