Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4120-389-14 WARNING All refrigerant -22 must be discharged from system before attempting removal of pressure regulating valve. (1) Discharge the refrigerant system per para.  5-3. (2) Purge the system per para.  5-4. (3) Puncture small hole in valve housing to relieve internal pressure. (4) Debraze the tube connections per para.  5-5. (5) Remove two screws, lockwashers and two nuts on the two clamps that secure the valve. (6) Remove the pressure regulating valve. c. Installation (1) Install the hot gas bypass valve in two clamps. (2) Assemble valve on tube ends. (3) Purge the system with nitrogen per para.  5-4. (4) Braze the tube connections per para.  5-5. (5) Install two screws, lockwashers and nuts in two clamps. (6) Replace the dehydrator per para.  5-10. (7) Leak test all newly connected joints and those in the repair area per para.  5-6. (8) Evacuate the system per para.  5-6. (9) Charge the system per para.  5-8. Follow-on procedure:  Install top cover (See para.  4-14). 5-47

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business