TM 9-4120-389-14
(6)
Braze all connections (See para. 5-5).
(7)
Replace the dehydrator (See para. 5-10).
(8)
Leak test all newly connected joints and those in the repair area (See para. 5-6).
(9)
Evacuate the system (See para. 5-7).
(10)
Charge the system (See para. 5-8).
(11)
Re-wrap insulation on suction tube and compressor joint.
Follow-on procedure: Install top cover (See para. 4-14).
5-75
|