|
|
TM9 4120-423-14&P
7
Position lifting device so that lifting hook is centered over air conditioner.
WARNING
During lifting operations, the mechanics must be visible to the lifting device operator and
in a position to physically guide the air conditioner as it is lifted into position.
8
Connect sling to the four outside corner air conditioner lifting rings and the lifting equipment.
9
Take care that mounting hardware and resilient mounts, between air conditioner and mounting
shelf, are not damaged or lost. Lift the air conditioner slightly, and carefully move it away from
shelter adapter enough to allow space to disconnect power cable and remote control cable.
10
Disconnect power cable and remote control cable from the front of the air conditioner. Do not
remove cables from shelter adapter duct.
WARNING
Do not allow anyone under equipment suspended from a lifting device. Do not allow the
unit to swing while suspended from a lifting device. Failure to observe this warning may
result in injury to personnel and damage to the equipment.
11
Lift the air conditioner off of the mounting shelf and place on transport carrier or on ground.
12
Disconnect sling from air conditioner.
13
Remove mounting hardware and resilient mounts from mounting shelf and retain for reuse, if
they are in good condition.
NOTE
Normally it is not necessary to remove the remote control assembly.
14
When necessary remove the remote control assembly from the inside of the shelter by loosening
the four captive screws and disconnecting the remote control cable.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |