Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
INSTALLATION
If the old probe is to be reinstalled, skip to step 3.
1
The sensing probe will be supplied with leads. Slip insulation sleeving over each lead for the
entire length, approximately 20 inches (50.8 cm).
2
Install a quick-disconnect terminal on each of the two probe lead ends.
3
If the sensor bracket was removed, use a screwdriver and wrench and install the bracket with the
two screws and locknuts.
4
Reapply adhesive sealant between probe and bracket.
5
Work the leads through the side panel and connect the two quick-disconnect terminals to the
terminals on the P4 to J15 harness.
6
Slip the insulation sleeving over the quick-disconnect terminals.
7
Install the front evaporator cover. See WP0025.
8
Install the return air screen and frame. See WP0027.
9
Install the air conditioner on the shelter. See WP0006.
END OF TASK
0019 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business