To install the J2 through-bulkhead connector, line up the holes in the gasket, connector, and
evaporator housing. Using a screwdriver, socket and ratchet, install the four screws and
locknuts. Reconnect the P2 and P2A plugs to the top and bottom of the through-bulkhead
connector.
2
To install the J9 through-bulkhead connector, line up the holes in the gasket, connector, and
evaporator housing. Using a screwdriver, socket, and ratchet, install the four screws and
locknuts. Reconnect the P9A plug from inside the access box.
3
Connect the P9 plug and harness to the J9 through-bulkhead connector.
4
To install the P4 to J15 wiring harness, connect the P4 plug to J4 on the electrical module.
Reconnect the two quick-disconnect terminals to the air temperature sensing probe.
NOTE
At this point, all connections should be complete except for J7 and P8. They will be
reconnected when the radio frequency filter and front cover are installed.
5
6
Install top evaporator cover. See WP0026.
7
Install access cover. See WP0024.
8
Install air conditioner on shelter. See WP0006.
END OF TASK