Click here to make tpub.com your Home Page

Page Title: TESTING - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-4120-423-14&P
3
Using multimeter, check resistance of 3 phase motor windings at P6: A to B, B to C, A to C
Resistances should all be above zero, but below 12 ohms.
4
Using multimeter, check resistance between pins E and F. Resistance should be zero, meaning
thermostatic switch is closed.
5
If motor fails any of the above tests, replace it.
6
If motor passes all of the tests above, check wiring connections between J6 and K3. (See wiring
diagram).
END OF TASK
0030 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business