| |
TM9 4120-423-14&P
6
Leak test all newly connected joints and those in the repair area. (See WP0073).
7
Install front condenser cover. (See WP0044).
8
Connect evaporator and condenser section assemblies. (See WP0014).
9
Evacuate and charge the Refrigerant R-22 system. (See WP0074 and WP0075).
10
Install air conditioner on shelter. (See WP0006).
END OF TASK
0081 00-3
|