Click here to make tpub.com your Home Page

Page Title: TESTING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
4
Remove tags.
5
Carefully form and position capillary tubing. Coil excess capillary tubing in three loops located
at clamp attachment point.
6
While purging the system with nitrogen, braze the capillary end into the tube tee. See WP0071
7
Using screwdriver, secure the capillary loops with a screw and clamp and three equally spaced
tiedown straps.
8
Replace the dehydrator. (See WP0080).
9
Leak test all newly connected joints and those in the repair area. (See WP0073).
10
Evacuate and charge the Refrigerant R-22 system. (See WP0074 and WP0075).
11
Install top condenser cover. (See WP0044).
12
Connect power.
TESTING
Press and release reset button on switch. Use a continuity tester or multimeter to check for continuity
between terminals 1 and 2 on switch. If there is continuity, the switch is properly closed. If no
continuity is found, press and release reset button again. If there is still no continuity, switch must be
replaced.
END OF TASK
0085 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business