Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
3
See tags, wire marking, and wiring diagram and connect leads.
4
Remove tags.
5
Carefully form and position capillary tubing. Coil excess capillary tubing in three loops located
at clamp attachment point.
6
While purging the system with nitrogen, braze the capillary end into the tube tee.
7
Using screwdriver, secure the capillary loops with a screw and clamp and three equally spaced
tiedown straps.
8
Replace the dehydrator. (See WP0080).
9
Leak test all newly connected joints and those in the repair area. (See WP0073).
10
Evacuate and charge the Refrigerant R-22 system. (See WP0074 and WP0075).
11
Install top condenser cover. (See WP0044).
12
Install left end condenser cover. (See WP0045).
13
Install air conditioner on shelter. (See WP0006).
14
Connect power.
TESTING
Use a continuity tester or multimeter to check for continuity between terminals 1 and 2 on switch. If
there is continuity, the switch is properly closed. If no continuity is found, switch must be replaced.
END OF TASK
0086 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business