TM9 4120-423-14&P
3
See tags, wire marking, and wiring diagram and connect leads.
4
Remove tags.
5
Carefully form and position capillary tubing. Coil excess capillary tubing in three loops located
at clamp attachment point.
6
7
Using screwdriver, secure the capillary loops with a screw and clamp and three equally spaced
tiedown straps.
8
Replace the dehydrator. (See WP0080).
9
Leak test all newly connected joints and those in the repair area. (See WP0073).
10
11
Install top condenser cover. (See WP0044).
12
Install left end condenser cover. (See WP0045).
13
Install air conditioner on shelter. (See WP0006).
14
Connect power.
TESTING
Use a continuity tester or multimeter to check for continuity between terminals 1 and 2 on switch. If
there is continuity, the switch is properly closed. If no continuity is found, switch must be replaced.
END OF TASK