|
|
TM9-4120-423-14&P
3
Leak test the entire refrigeration system in accordance with WP0073 after any replacement
action that required brazing.
4
Replace the dehydrator and leak test the dehydrator flare fittings as the final step in any
maintenance action that required the Refrigerant R-22 pressure system to be opened.
5
other maintenance actions are completed.
6
Install air conditioner on shelter. (See WP0006.)
END OF TASK
0090 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |