Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-4120-423-14&P
INSTALLATION
WARNING
When handling coils, wear gloves to avoid cuts and reduce fin damage on the coil.
1
Carefully tilt coil and place into position in housing, through left end.
2
Using screwdriver, secure coil to housing with ten screws.
3
No air passage is permitted at top or bottom of condenser coil. Seal these areas with insulation.
Bond the insulation in place with adhesive.
4
While purging the system with nitrogen, braze the tubing joints. (See WP0071and WP0072).
5
Install the following components:
6
Solenoid valve (L1), bracket, and related piping per WP0093 and WP0094.
7
Compressor per WP0097.
8
Low pressure switch per WP0086.
9
High pressure switch per WP0085.
10
Relief valve and related piping per WP0087.
11
Replace the dehydrator. (See WP0080).
12
Check to be sure all tubing has been reconnected.
13
Leak test all newly connected joints and those in the repair area. (See WP0073).
14
Evacuate and charge the Refrigerant R-22 system. (See WP0074 and WP0075).
15
Install condenser guard and condenser inlet EMI screen. (See WP0046).
16
Install left and right end condenser covers. (See WP0045).
17
Install top condenser cover. (See WP0044).
18
Install air conditioner on shelter. (See WP0006).
END OF TASK
0095 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business