Click here to make tpub.com your Home Page

Page Title: TEST AND INSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
29
Remove the pump, reservoir, filter, and filter-drier jumper. Place an empty container below the
compressor connections and connect a cylinder of dry nitrogen to each filter-drier connection in
turn. Blow down each leg of the system at 50 psig (3.5 kg/square centimeter) for at least 30
seconds.
30
Disconnect the dry nitrogen cylinder. Cap or plug open connections if compressor and filter-
drier are not to be installed immediately.
TEST AND INSPECTION
WARNING
Disconnect input power to the air conditioner before performing any maintenance to the
electrical system. Voltages used can be lethal. Shutting the unit off at the control module
does not disconnect power to the various components of the air conditioner.
Compressor Electrical Test
1
Be sure power has been disconnected from air conditioner.
0097 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business