TM9 4120-423-14&P
29
Remove the pump, reservoir, filter, and filter-drier jumper. Place an empty container below the
compressor connections and connect a cylinder of dry nitrogen to each filter-drier connection in
turn. Blow down each leg of the system at 50 psig (3.5 kg/square centimeter) for at least 30
seconds.
30
Disconnect the dry nitrogen cylinder. Cap or plug open connections if compressor and filter-
drier are not to be installed immediately.
TEST AND INSPECTION
WARNING
Disconnect input power to the air conditioner before performing any maintenance to the
electrical system. Voltages used can be lethal. Shutting the unit off at the control module
does not disconnect power to the various components of the air conditioner.
Compressor Electrical Test
1
Be sure power has been disconnected from air conditioner.