Click here to make tpub.com your Home Page

Page Title: Shipping Container
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
AIR CONDITIONER, COMPACT, HORIZONTAL,
0001-00
GENERAL INFORMATION - Continued
PREPARATION FOR STORAGE AND SHIPMENT - Continued
Preparation For Shipment
Prepare unit as prescribed for long term storage.
Shipping Container
1.
Fabricate a corrugated paper shipping container conforming to ASTM-D-3951-95 Level AB, Domestic Type. A
minimum of 1-inch clearance will exist between the air conditioner and walls of the box. The box will be modified
with skids located so that the bolts securing the air conditioner pass through the skids. Bolt heads will be
countersunk into the bottom of the skids. The bolts with washers should protrude at least 3/8 inch above the skid and
not more than inch.
2.
The air conditioner will be packed in the shipping container and secured to the skids with four bolts (3/8-24) and
washers.
3.
Wood spacers will be padded with water resistant cushioning material to prevent abrasion. Corner pads constructed
of corrugated paper will be used on all top and bottom edges of the air conditioner.
4.
The shipping container will be closed and secured with steel strapping material.
5.
The air conditioner will be stored and shipped in the operating (upright) position. The words "THIS END UP" with
arrows will be placed on each side of the shipping container. The letters will be black, at least 3 inches high, and
located within the upper third of each side.
WARRANTY INFORMATION
The air conditioner is warranted for 60 months from the date of acceptance for the end item air conditioner. The
warranty starts on the date found in block 23 of DA Form 2408-9, Equipment Control Record. Report all defects to your
supervisor, who will take appropriate action.
NUCLEAR HARDNESS
All hardness critical procedures in this manual are marked with the acronym HCP as follows:
1.
When an entire task including all paragraphs and procedures is considered hardness critical only the task title will be
marked by the acronym HCP (placed before the title).
2.
When only certain processes and steps within the work package are hardness critical, only the applicable processes
and steps will be marked by placement of the acronym HCP between each applicable step number and the text.
END OF TASK
0001-00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business