Click here to make tpub.com your Home Page

Page Title: CHECKING UNPACKED EQUIPMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
UNIT MAINTENANCE
0015-00
SERVICE UPON RECEIPT - Continued
CHECKING UNPACKED EQUIPMENT
1.
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the damage
on DA Form 368 Quality Deficiency Report (QDR).
2.
Check the equipment against the packing slip to see if the shipment is correct and complete. Report all discrepancies
in accordance with the instructions of DA PAM 738-750.
3.
Check to see whether the equipment has been modified.
INSTALLATION
General
1.
Air conditioner is assembled and ready for operation.
2.
It contains full charge of refrigerant and compressor oil.
Mounting
1.
Place the unit on a firm, level surface to permit proper drainage of water that condenses out of the air or rain.
2.
Position the unit so that the control panel, the condenser, and the evaporator louvers are accessible to the operator
and to maintenance personnel.
3.
Check that there are no obstructions in front of any air intake or discharge louvers or other openings.
4.
The dimensions for base-mounting holes on the enclosure mount (6) are shown on the dimension and hardware
location illustration. The resilient mount (3), washer (2), spacer (4), elastomeric tube (5) and cap screw (1) are
shipped with the air conditioner.
5.
Connect a drain line if necessary.
0015-00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business