|
|
TM 9-4120-425-14&P
MAINTENANCE ALLOCATION CHART FOR 36,000 BTU AIR CONDITIONER Continued
0118-00
Table 1. MAC for 36,000 BTU Air Conditioner - Continued
(5)
(6)
(1)
(2)
(3)
(4)
TOOLS AND
REMARKS
GROUP
COMPONENT/
MAINTE-
MAINTENANCE LEVEL
EQUIPMENT
NO.
ASSEMBLY
NANCE
FUNCTION
UNIT
DS
GS DEPOT
C
O
F
H
D
09
Remote Control Inspect
0.1
Module and
Adjust
0.1
L
Heater
Repair
2.0
1
S
Subassembly
Replace
0.5
1
Test
1.0
1
K
10
Junction Box
Inspect
0.2
Assembly
Repair
0.8
1,6,9
C
Replace
0.5
1
Test
0.5
1
M
11
Unit Wiring
Inspect
0.5
Repair
2.5
1
C
Replace
1.5
1,6,9
Test
1.0
1
12
Valves, Coils
Inspect
0.2
and
N
Test
0.3
1,2
Refrigeration
J
Repair
7.5
1,2
Components
Replace
7.5
1 thru 5
13
Test
1.0
1,2
Repair
3.0
1,2
D
Replace
9.0
1 thru 5
14
Housing
Inspect
0.5
1
Service
0.5
1
Repair
1.0
1,6,7,8,9
D
Replace
8.0
1,6,7,8,9
0118-00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |