Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-428-14
0030 00
2. Center or mid-range of the thermostatic switch represents a setting of about 75 Degrees F (24 Degree C). With the
sensing bulb remaining in the container of warm water, 75 80 Degrees F (24 30 Degrees C), slowly turn the knob
from extreme warmer position towards the cooler position. Continuity should cease before or near mid-range of the
knob.
REPLACEMENT
Replace the thermostatic switch if defective.
INSTALLATION
1. Place the thermostatic switch (8) on the mounting frame (7) and secure with four machine screws (9), flat washers (11),
and self-locking nuts (10).
2. See tags and wiring diagram (WP 0028 00) and connect the wire leads. Remove tags.
3. Check that grommets (13) are in place in the shaft holes.
4. Slip the mounting frame (7) in place and align holes in the back plate with three spacer posts (6). Check that the
grommets (13) are still in place in the shaft holes. Secure with three machine screws (5).
5. Install the knob (4) and tighten the setscrew (3).
6. Slip the control cover (2) in place and secure with four machine screws (1).
NOTE
FOLLOW-ON MAINTENANCE:
Install control module (WP 0029 00)
END OF WORK PACKAGE
00030 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business