INSTALLATION
1. Connect transformer leads and verify wire labels to wire list and schematics (WP 0040 00).
2. Secure transformer (3) to junction box chassis (4) using two lock nuts (2) and two screws (1).
3. Install junction box (WP 0028 00).
4. Install front top cover (WP 0018 00).
Figure 2. Transformer Removal
END OF WORK PACKAGE