| |
TM 10-4130-239-14
5-28.
START-RUN VALVE ASSEMBLY REPLACEMENT (CONT)
Equipment
Condition
Para
Condition Description
Tools
5-26
Thermostatic valve
removed.
Materials/Parts:
Polyurethane Foam, item 20, Appendix E
Mold Release, item 13, Appendix B
Solder, item 29, Appendix B
Sealant, Compound, item 27, Appendix E
1.
Set water chiller on its side.
2.
Remove 16 bottom plate mounting screws.
Remove bottom plate.
Clean threads in skid hose using tap.
3.
Break up foam insulation around START-RUN valve assembly.
5-67
|