|
|
TM 5-4120-273-15
tion in crate fabrication. Provide suitable blocking
and tie downs to prevent unit from shifting dur-
Reinstall the air conditioner as instructed in para-
ing transfer.
graph 2-5.
Section III. CONTROLS AND INSTRUMENTS
in the upper rear panel, covered with a thin piece
2-9. General
of rubber material directly in front of the switch
This section describes, locates, illustrates, and
for this reason.
furnishes the operator, crew or organizational
maintenance personnel sufficient information
c. Low Pressure Switch. The low pressure
about the various controls and instruments for
switch, located at the upper left rear of the unit
proper operation of the air conditioner.
the compressor and will cutout at 25 psig. When
the line pressure has increased to 50 psig, the low
pressure switch can be reset by pushing the reset
a. General. The purpose of controls and instru-
button in, with a pencil like object, and holding it
ments and their normal readings are illustrated
for approximately 2 to 3 seconds. There is a hole
in figure 22.
in the upper rear panel, covered with a thin piece
b. High Pressure Switch. The high pressure
of rubber material, directly in front of the switch
switch, located at the upper left rear of the unit
for this reason.
the compressor and will cutout at 445
d. Liquid Line Sight Glass. The sight glass
psig (pounds per square inch gage). When the
line pressure has reduced to 400 psig, the high
ture in the refrigerant is shown by the indicator
pressure switch can be reset by pushing the reset
turning from green to yellow. A shortage of re-
button in, with a pencil like object, and holding
frigerant is indicated by flash gas in the sight
if for approximately 2 to 3 seconds. There is a hole
glass.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |