Click here to make tpub.com your Home Page

Page Title: Section II. MOVEMENT TO NEW WORKSITE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-273-15
BLOCK OFF PLATE:
STEP 1 - REMOVE COVER PLATE FROM BLOCK OFF PLATE AND
INSTALL ELECTRICAL CONNECTOR FROM REAR,
SECURE WITH SCREWS (4).
STEP 2 - REPLACE CONTROL BOX WITH BLOCK OFF PLATE AND
SECURE WITH SCREWS (4).
MEC 4120-273-15/2-1
Figure 21 (3)Continued
Section II. MOVEMENT TO NEW WORKSITE
(3) Unbolt unit from mounting surface.
2-7. Dismantling For Movement
a. General.
b. Short distance movement. Use a forklift and
(1) Shut off electrical power supply to air
lift unit at base.
conditioner and disconnect power cable from unit.
c. Long distance movement. Crate the air con-
(2) Disconnect drain hose from unit.
ditioner, providing adequate protection to grilles
Note. Disconnect all duct work and remote control
cable if used with unit.
and control box. Refer to TM 38-250 for instruc-
2-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business