Click here to make tpub.com your Home Page

Page Title: Section II. MOVEMENT TO NEW WORKSITE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-274-15
Figure 2-1 (3)-Continued.
Section II. MOVEMENT TO NEW WORKSITE
new worksite using the recessed handles at
2-7. Dismantling for Movement
aides of unit.
a. General.
c. Long distance movement. Crate the air con-
(1) Shut off electrical power supply to air
ditioner, providing adequate protection to grilles
conditioner and disconnect power cable from unit.
and control box. Refer to TM 38-250 for instruc-
(2) Disconnect drain hose from unit
tion in crate fabrication. Provide suitable blocking
and tiedowns to prevent unit from shifting during
Note. Disconnect all duct work and remote control
transfer.
cable if used with unit.
(3) Unbolt unit from mounting surface.
2-8. Reinstallation after Movement
Reinstall the air conditioner as instructed in para-
b. Short distance movement. Use a forklift
graph 2-5.
and lift unit at base, or carry unit to

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business